Project Info
Client Roadtek (Transport & Main Roads, QLD)
Project Description
Locations: Roma, Injune, Yuleba, Reedy Creek, Mulgowie Road, Condamine and St George
Duration: 2011 – 2014
Following various natural disaster events across Queensland between 2010 and 2012 Repair and rehabilitation of the road and water network across Queensland was required. Collaborative works with numerous Clients over a 3 year period has seen involvement in programs such as; Transport Network Rehabilitation Program (TNRP), Australia Pacific Liquefied Natural Gas (APLNG) Civil Construction Works and Queensland Transport and Roads Investment Program (QTRIP).
Works included;
- Insitu stabilisation – pavement repairs (part road width),
- Insitu stabilisation – pavement rehabilitation (full width),
- Road/Shoulder Widening,
- Insitu stabilisation and gravel overlay (full width),
- Floodway Rehabilitation
- Full Culvert and Culvert Repair Works,
- Batter, Cutting and Table drain reinstatement
- Rock Mattress Protection